FD250HQ

Bedford Hills - 3rd Alarm. 1-8-13

1 post in this topic

Date: 1/8/13
Time: 18:33
District: Bedford Hills
Location: 109 Stone Bridge Lane
Units:
{BHFD: 2031, 2032, 2033, E-198, E-199, R-10, T-5, TL-57}
{BVFD: E-108, E-109}
{MKFD: 2281, 2284, U-13, R-31(FAST)}
{BFD: 2581, T-17}
{GBFD: 2142, 2143, T-1}
{KFD: 2284,T-6, E-116}
{PRFD: 2405, T-3}
{CFD: 2061, E-146, R-23}
{AFD: 2021, T-9}
{SFD: T-16}
{SSFD: 2453, E-168}
{CFFD: T-8}
{YFD: 2535, T-51}
{OFD: 2232, 2334, E-98, U-51(FAST)}
{WCDES: Bat-16, C/O ZONE 5, CC1}
{OTHER; NYSEG-1, WCPD: K9A1,BLDG-D}
{KBH-VAC: 6511, 65B1/2} {45M: 45M1}
Standby Units:
PFD:2372,TL-5
CFFD:2071,E-148

Frequency: 46.26,Fire 16,Ops 1,fire ground 1, wcpd dispatch
Weather Conditions:clear,mild
Reporters: FD250HQ, x4093k, Larchmont-Boy

Description: 100X75, 2.5 STORY WOOD FRAME

18:33-Tones went out for bedford hills to 109 Stone bridge lane for a residential alarm
18:39- 2031 requesting 108 to the scene
18:42-2033 Working fire, 65B2 advised and awaiting crew
18:46-Establish a water source at Church/Main
18:47-NYSEG both electric and gas requested
18:49-2 lines stretched and in operation water is on the fire requesting c&o
18:49-Banks re-tone for a driver for tanker 17
18:56-Per Bat-16 tanker shuttle established fire conditions remain the same
18:58-Bat-16 E-103, and all tankers to ops 1
18:58-Per 2031 2 engines to the scene
19:00-BAT 16 transmitting a second alarm
19:05-3 lines stretched on second floor and in operation fire on the first floor knocked down c&o members on scene
19:05-Per 2281 R-31 to the fill site on main and church
19:06-6511 req 65B1 to scene
19:16-CC24 having WCPD-K9A1 to scene
19:18-3RD Alarm being transmitted per 2031
19:24-BAT-16 Reporting fire throughout second floor and in the cockloft evacuation tones have been dropped
19:25-Bat16 rpts 100x75 2.5 story frame, fire throughout structure
19:27-Per C2031 heavy fire on 3rd floor exterior ops
19:28-2032 Is water source officer on fire ground 2
19:31-Beford center and buxton is 2nd fill site
19:38-L-51 in operation per bat-16
19:48-bat 16 requesting an eta on nyseg
19:49-60 rpts a 10 min eta on nyseg
20:14-Duration of incident 1 hour and 45 min

20:27-2 lines in operation back to interior attack

20:32-Per BAT16 advising building department was notified through the pd

21:19-Per 2031 situation under control

21:25-inside odor of smoke

21:31-Per 2031 releasing armonk,somers,golden's bridge tankers

21:34-CC1 is back in service

21:35-Ossining FAST released yokrtown is resuming fast duties,u-13 in service as well

http://www.lohud.com...e-Bedford-Hills

http://bedford.patch...one-bridge-lane

http://westchester.n...-1.4422485?qr=1

PM with any info

Edited by FD250HQ
FF398, okcomputer, EFD1883 and 4 others like this

Share this post


Link to post
Share on other sites




  • Recently Browsing   0 members

    No registered users viewing this page.