my dept runs a 250ft of 2 1/2 with a wye and our rig carries a couple 1 3/4 apt packs with a 150ft each

Share this post


Link to post
Share on other sites



3 speed lays with 2 of them have 200 ft 1 has 150ft then we have to cross lays with 200 ft on both we have two apartment pack both 100ft each then we carrie 600 ft of 3" with a wye the speed lays , crosslays and the apartment packs are all1 3/4

Share this post


Link to post
Share on other sites

For the long hydrant stretch, E191 carries 1200 feet of 5" Rubber LDH w/ Storz connectors...

It is a pain in the rear to reload all that after you've just had a job...

(Yes, I am in the truck company and I have had to reload all of it!)

Share this post


Link to post
Share on other sites

Briarcliff Fire Company

E93 '91 Beck (Simon/Duplex) 1500gpm 1000gal

Crosslays

200' 13/4" Red hose with 13/8" smooth bore tip

200' 13/4" Blue hose with an adjustable fog nozzle

200' 21/2" with a smooth bore pyrolite playpipe

200' 5" Storz Hi-Combat

Rear Load

400' 21/2" preconnect with an adjustable fog nozzle

800' 3" Supply line

1200' 5" Storz

2 100' 13/4" Apartment packs

3" prepiped deck gun w/fog tip and smooth bore stacked tips

E94 '81 Mack 1250gpm 500gal

Crosslays

200' 13/4" Red hose with 13/8" smooth bore tip

200' 13/4" Blue hose with an adjustable fog nozzle

Rear Load

1500' 5" Storz

800' 3" Supply

400' 21/2" Preconnect with smooth bore pyrolite playpipe

All supply line is yellow and attack lines are red, white, or blue.

Share this post


Link to post
Share on other sites

for most of us up north here:

TANKER TANKER TANKER TANKER TANKER TANKER TANKER TANKER TANKER TANKER TANKER TANKER TANKER

BIG POND

Share this post


Link to post
Share on other sites

Our new engine has 2 300' crosslays, 150 front trash line and 200' packs on the pass side. our other attack truck has 100', 150, 200 crosslays. The source and the tankers have 150' 1 3/4 adn 150' 2 1/2 crosslays. As for LDH--all pumping apparatus (all our trucks except the brush and rescue) have 1000' of 5" snap tite. The source truck has 3,000 (usually 4,000) or 5"

Share this post


Link to post
Share on other sites

Nicholas994 could'nt have said it better

TANKERS TANKERS AND MORE TANKERS NHFD & GFD 7000 GALS ON THE ROAD

But because tankers dont put the fire out My attack rig has a 100' bumper 1 3/4" preconnect , 2 200' preconnects of 2" and 1 3/4" , and a "High Rise" Pack with spare 1 3/4". The rear has 300" of 1 3/4" , 300' of 3" attack line and for the really long stubrun fires we use "The Bomb" 2000' of 5".

Share this post


Link to post
Share on other sites
Guest
This topic is now closed to further replies.
Sign in to follow this  
Followers 0

  • Recently Browsing   0 members

    No registered users viewing this page.