Sign in to follow this  
Followers 0
PFDRes47cue

Elmsford - Working Fire 6/15/2012

1 post in this topic

Date: 6/15/2012

Time: 16:22

Location: 22 Woodside Avenue (Cross Knollwood Road)

Frequency: 46.26, Fire 14, FG 2

Units Operating: [Elmsford FD:]; [Ardsley FD: L50, 2013]; [Hartsdale FD: E170]; [Valhalla FD: R9 (FAST)]; [Fairview FD: E174, R3]; [Tarrytown E80, 2462]; [Ossining FD: 2334, E99, U51 (FAST)]; [Hawthorne EMS: 63B2]; [Plesantville VAC: 7602, 7605 (Rehab)]; [irvington FD: L36]; [WCDES: EMS B11, FD B12]; [Greenburgh PD]; [Elmsford PD]; [Con Edison.]

Units Relocated: [Tarrytown FD: L31]; [Pocantico Hills FD: E189]; [scarsdale FD; E56]

Weather Conditions: Warm, dry

Description Of Incident: Working fire in a 25x50 2-story P/D. House fully involved on arrival. Extension to B Side exposure which is a 2.5-story similar. Crew entered the B Side exposure and found fire in the attic. Master streams used to quickly knock down the fire in the original fire building.

Reporters: Sailr322

Writer: PFDRes47cue

16:20 - Elmsford FD toned out for structure fire.

16:22 - Elmsford FD, Valhalla FAST, Fairview Engine, Irvington Ladder, toned out for 10-75.

16:23 - Hartsdale Engine and Hawthorne EMS requested to the scene.

16:29 - Exposures on B and C Sides, 25x50 2-story wood frame fully involved, fire in the exposure as well.

16:30 - 2163 standing-by in EFD HQ, L50, E80, L36 requested to the scene, E189 to EFD HQ

16:31 - Pocantico Hills one engine to the scene.

16:32 - L50 responding to the scene

16:33 - E80 and L36 responding to the scene

16:38 - L50 requested to expedite to the front of the structure

16:39 - L50 and 2013 on location

16:42 - E80 and 2462 on location, L31 standing-by in EFD quarters

16:43 - R3 on location

16:47 - Con Ed cut power to the whole block

16:48 - All hands working, first structure is fully involved exterior operations underway, all units interior attack on the second structure

16:50 - Ossining FAST, Battalion 12, and a rehab to the scene by IC

16:51 - E175 to EFD HQ, Pleasantville Rehab and EMS Battalion 11 to the scene

17:12 - E56 out at Fairview

17:19 - Operation at 1 hour, all exterior operations on both first and second building

17:25 - Battalion 11 on scene

17:41 - Battalion 12 back in service

17:43 - Pleasantville Rehab setup and in service

18:04 - E56 returning to Scarsdale

18:19 - All exterior attacks, all hands still working, duration of incident 2 hours

19:25 - As per Battalion 11 releasing: Irvington, Tarrytown, and Ardsley units from the scene

Edited by PFDRes47cue

Share this post


Link to post
Share on other sites



Sign in to follow this  
Followers 0

  • Recently Browsing   0 members

    No registered users viewing this page.