Sign in to follow this  
Followers 0
sfrd18

Bridgeport - Working Fire 07-24-11

1 post in this topic

Date: 07-24-11

Time: 01:47hrs.

Area: Upper East Side

Location: 89 Hastings St.(Bing Maps)

Frequency: Bridgeport Fireground - Channel # 2(153.700)

Weather Conditions: Hot and Humid

Description Of Incident: Ladder 10 o/s reporting fire showing from the loading dock and through the roof of a single-story vacant 100x75 factory. Numerous L/S/O's w/master stream and ladder pipe in operation. Companies using defensive operation. All searches negative w/no injuries reported.

Reporters: sfrd18

Writer: sfrd18

Units Operating: BFD; BPD; AMR

Box Assignment:

Engine 15, Engine 1, Engine 10, Engine 6(R.I.T.), Engine 12(S/C)

Ladder 10, Ladder 5

Rescue 5

Battalion 2

Deputy 3

Training 3(Safety)

01:50hrs. - Ladder 10 o/s reporting fire showing. Ladder 10 has command.

01:52hrs. - Ladder 10 reporting large pile of wood burning on loading dock.

01:57hrs. - Battalion 2 o/s and taking command. Battalion 2 reporting heavy fire on the loading dock and through the roof.

02:02hrs. - Battalion 2 requesting an additional engine S/C. Battalion 2 requesting a Code 7(FM).

02:18hrs. - Battalion 2 reporting main body of fire is k/d. Companies using defensive operation w/1 ladder pipe in use. Holding up on Recall.

02:32hrs. - Deputy 3 o/s and taking command.

Share this post


Link to post
Share on other sites



Sign in to follow this  
Followers 0

  • Recently Browsing   0 members

    No registered users viewing this page.