Sign in to follow this  
Followers 0
firefighter59

Chappaqua - Working Fire 6/23/11

1 post in this topic

Date:6/23/11

Time:18:25

Location: 10 Peck Place

Frequency: Fire 16

Units Operating: Chappaqua Full Assignment, Mt. Kisco FAST and One Engine, Pleasantville one engine with 5 inch, Armonk one engine to cover, Batt 16

CFD: 2061, 2062, 2063, E144, E145, E146, TL27, R23], [MKFD: E106, U13 ], [PFD: E91], [bHFD: E198 (FASTeam)], [WCDES: Bat 16, C and O zone 5, Car 24], [CVAC: 54B1], [WEMS: 45M1], Con Ed, NCPD

Units on Stanby at CFD HQ: [AFD: 2023, E286], BHFD E198 after U/C transmitted.

Weather Conditions: Cloudy

Description Of Incident:Working fire in a basement, new development

Reporters: Firefighter59 , firedude , efermann

Writer:Firefighter59

1825 Chappaqua dispatched to a reported structure fire

1832: New Castle PD reported heavy smoke from structure

1832: 2062 requested full 10-75 assignment

1833: Mt. Kisco FAST to scene and one engine to stand by at Chappaqua, Pleasantville (engine with 5"), 45 M1, Bat 16

1834: E144 responding

1835: Mt. Kisco relocate 1 engine

1835: Mt. Kisco FAST assembling

1836: 2062 reporting basement fire; 2 story ordinary construction 30'x60'

1837: 2061 responding

1838: Mt. Kisco FAST responding

1839: E106 relocating to Chappaqua

1839: Bat 16 on location

1840: Bat 16 requesting E106 to scene; Armonk Engine to stand by in Chappaqua

1843: 2061 assuming command; Bat 16 - heavy fire in the basement with extension to 1st and 2nd floor. 2 lines streatched, water on fire. Have the Pleasantville Engine stage on Hamilton with crews on air to walk to the scene.

1845: Bat 16 requesting additional FAST

1900: C&0 Car 24 responding.

1940 Under Control , Overhaul in progress

PFDRes47cue likes this

Share this post


Link to post
Share on other sites



Sign in to follow this  
Followers 0

  • Recently Browsing   0 members

    No registered users viewing this page.