Sign in to follow this  
Followers 0
FFFORD

Shelton - Working Fire - 12/21

1 post in this topic

Date: 12/21/09

Time: approx 11:00

Location: 53 Geisler Ave

Frequency: 33.86(SFD), SPD, SEMS

Units Operating: SPD, Fire Police, E32, L33, E2, E42, Squad 5, 2v30, 1v21, FM1, Car1, Car 6

Weather Conditions: Clear

Description Of Incident:

Working structure fire in a 2 1/2 story wood frame PD. upon arrival smoke from B side of the structure. had a problem with the first hydrant and had to switch to a further plug. 3 hand lines went to work. house was evacuated. Fire appears to have started in the kitchen and spread. most damage was to B/C side kitchen, 2nd floor, and attic. one FF injured and transported by EMS to hospital. main body of fire was k/d pretty fast but had lots of hot spots with some rekindle. approx 12:00 it was placed under control. pictures to come.

Reporters:

Writer:me (o/s)

Share this post


Link to post
Share on other sites



Sign in to follow this  
Followers 0

  • Recently Browsing   0 members

    No registered users viewing this page.