Date: 2/24/09

Time: 03:47 hours

Location: 22 James St x St. James Place

Frequency: 154.250 (FDNY Manhattan)

Weather Conditions: Windy and Below Freezing

Description Of Incident: Fire in a 6 story OMD extended throughout the building and through the roof and multiple civilian injuries.

Writer: ryang

Additional Info:

Two Bridges/Chinatown, Manhattan, NY, 2/24/09

Address: 22 James St between Madison St and St. James Place

Phone Box 132 - Report of fire in a MD

Engs. 9, 6, 7

L6, TL1

Battalion 1

10-75-132 - 03:54 hours

E9: 10-75 the box, we believe we have fire on the 2nd floor, we have people on the fire escapes!

E55

L8 is the FAST Truck

Battalion 4

Rescue 1

Squad 18

Division 1

03:57 hours

E10, L10 S/C

7-5-132 - 03:58 hours - Duration 10 minutes

Battalion 1: We have fire possibly on the 4th floor and 3rd floor at this time. We have multiple people coming down the fire escape. 25x75, 6 story building, using All-Hands.

RAC1

Fire Building Height/Size-up:

6 story 25x75 OMD

Exposures are:

1 - street

2 - 5-story building

3 - yard

4 - 5-story building

03:58 hours

Receiving report of person trapped on the rear balcony

04:06 hours - Duration 20 minutes

Division 1: We have 2 lines stretched, fire is Doubtful, we have a 10-45.

04:06 hours

Receiving an alarm activation in apartment 8.

2-2-132 - 04:08 hours

DC1: Transmit a second alarm, we have numerous 10-45s!

Engs. 15, 4, 28

E24 w/ Satellite 1

L20

Battalion 2 (Safety Officer)

Battalion 31 (Resource Unit Leader)

Rescue, Safety Battalions

Tactical Support 1

FieldCom, Command Tactical Unit

04:09 hours - Duration 23 minutes

DC1: We have fire on the 2nd floor, still trying to determine the number of 10-45s.

04:10 hours

DC1: At this time, confirming 2 10-45s.

04:11 hours

DC1: We now have 3 10-45s.

04:21 hours

Car 9 (DAC John Sudnik, Queens Borough Commander) is responding.

04:21 hours - Duration 33 minutes

DC1: We've got another 10-45 this box, total of 4.

04:22 hours

Battalion 48 is relocating to Battalion 2

04:24 hours

DC1: At the 2nd alarm we have a 3rd line in operation, k.

04:25 hours

DC1: At the 2nd alarm we need 2 additional trucks.

TL15, TL18 S/C

04:26 hours - Duration 38 minutes

04:29 hours - Duration 41 minutes

The staging area is Chambers St and St. James Place

04:32 hours

E226 is relocating to E4

3-3-132 - 04:33 hours

Engs. 33, 205, 224, 14

Battalion 6

Battalion 7 (Staging Manager)

Battalion 58 (Air Recon Chief)

Mask Service Unit 1

04:34 hours

FC: Have all the chiefs on the 3rd alarm report directly to the command post, and have the 1st due engine and truck respond directly to the command post.

04:39 hours - Duration 49 minutes

FC: Advise the staging chief when they arrive on scene to contact FieldCom on handy-talky channel 5. Also progress report for Manhattan 3rd alarm Box 132, at this time Car 9, DAC Sudnik reports: Heavy fire in the shaft in the rear of the fire building. Primary searches are still underway, and the fire is still Doubtful.

04:40 hours

L110 is 10-8 in L20's response area

04:42 hours

The staging area has been changed to Madison St and Catherine St.

04:45 hours

TL13 is 10-8 in TL18's response area

04:48 hours

Car 1B (Commissioner's Liaison) and Car 36B (Department Chaplain) are responding

04:50 hours

FC: Can you try to raise E205 and advise them to also report directly to the command post.

04:50 hours

Manhattan unable to raise E205.

04:53 hours

Car 11A (Chief of Rescue Operations) is responding

05:05 hours

FC requests a mixer-off message

05:07 hours

Battalion 58: Air recon is going to be grounded due to the wind conditions, PD Aviation will not be flying today.

Battalion 58 is 10-8 back to Brooklyn

05:09 hours - Duration 1 hour 21 minutes

FC: Progress report for Manhattan 3rd alarm box 132, at this time DAC Sudnik, Car 9, reports: There is a total of 9 10-45s: 3 10-45 code 2s (Red Tag, Immediate) and 6 10-45 no codes, total. The fire is darkening down, primary searches delayed due to heavy fire condition, and the fire is Doubtful.

05:24 hours

FC: Special call 2 additional truck companies. Have them report in to the staging area for now.

L11, TL9 S/C

05:33 hours

FC: Special call 2 additional battalion chiefs.

Battalions 35, 10 acting 6 S/C

05:35 hours

FC: Have them report directly to the command post.

4-4-132 - 05:36 hours

FC: At Box 132, DAC Sudnik, Car 9 reports we have fire on the 5th and 6th floors, transmit the 4th alarm.

Engs. 53 acting 5, 3, 16, 65

E262 w/ IMT Unit

Battalion 45 (Planning Sections Chief)

Car 12 (Acting BC Stephen Raynis, Chief of Safety and Inspectional Services)

05:52 hours

E58 is 10-8 in E65's response area

06:00 hours - Duration 2 hours 12 minutes

FC: Progress report for 4th alarm Box 132, Car 9 reports: Fire on floors 4, 5, and 6. Handlines moving in through the interior and fire escape. Searches in progress and fire is Doubtful.

06:00 hours

Car 12C (OSHA Duty Car) is 10-84

06:13 hours

FC: Special call 2 additional ladder companies.

L5, L108 acting 3 S/C

06:28 hours - Duration 2 hours 40 minutes

FC: Progress report on 4th alarm Box 132, DAC Sudnik, Car 9 reports: Fire on the 4th floor is darkening down. We have fire on the 6th floor and through the roof. 2 lines stretched into exposure 2 to prevent extension, and fire is Doubtful.

06:31 hours

Battalion 42 is 10-8 in Battalion 4's response area.

06:33 hours

L101 is relocating to L6

06:34 hours - Duration 2 hours 46 minutes

FC: At 4th alarm Box 132, DAC Sudnik, Car 9 reports: There is now a total of 20 10-45s: 5 code 2s, 15 codes 3s (Yellow Tag, Delayed).

06:47 hours - Duration 3 hours

FC: Progress report for 4th alarm Box 132, At this time: main body of fire has been knocked down on the 4th and 5th floors. Still have heavy fire on the exposure 2 side of the 6th floor. Making good progress with handlines. There is no extension into exposure 2, and searches throughout exposure 2 are negative. Fire remains Doubtful.

07:01 hours

Car 4 (Chief of Fire Operations Patrick McNally) is 10-84

07:21 hours

E279 is 10-8 in E28's response area

07:34 hours

Car 23 (Public Information, Executive Officer) is responding

07:40 hours

IMT Unit: The planning chief requests the original time out of this incident.

Original time out was 3:47 hours

07:41 hours - Duration 3 hours 53 minutes

FC: Progress report for 4th alarm Box 132, at this time Car 4, Chief of Operations McNally places this fire Probably Will Hold.

07:48 hours

FC: Request Buildings to respond to Box 132 to check the stability of the building.

07:49 hours

Buildings Dept reports a representative on-scene.

07:50 hours

Car 11A is 10-8 back to Citywide.

08:33 hours

Battalion 10 acting 6 and E14 are 10-8.

08:46 hours - Duration 5 hours and 2 minutes

FC: At 4th alarm Box 132, at this time Car 4, Chief of Operations McNally places this fire Under Control.

5-5-132 - 09:05 hours

FC: At Box 132, transmit a 5th alarm with 4 engines, 2 trucks, and a Battalion Chief to respond for relief purposes.

09:44 hours

FC: Box 132, primary searches on the top floor are complete and negative with the exception of the collapsed area.

10:20 hours

DC1: At the 5th alarm, primaries and secondaries throughout are complete and negative except in the collapse zones. We had a partial collapse of the roof onto the 6th floor, and partial collapse of the 3rd floor onto the 2nd.

10:24 hours

DC1: At the 5th alarm, we also had collapse of the 6th floor onto the 5th floor in the rear.

Edited by ryang

Share this post


Link to post
Share on other sites



Guest
This topic is now closed to further replies.
Sign in to follow this  
Followers 0

  • Recently Browsing   0 members

    No registered users viewing this page.