Date: 7-3-06

Time:1345hrs

Location: 43-25 43rd st

Frequency: 154.400

Units Operating: Numerous FDNY

Description Of Incident: Fire in mansion ????

Writer: ICEEMT21

1514hrs- 3rd alarm has been transmitted. Staging is Queens Blvd and 43 st

1521hrs- Request 2 additional trucks above the 3rd(TL 138 and H&L 104)

1530hrs- Fall Back Step 3

1534hrs- Request for additional RAC unit

1537hrs- Request for HAZMAT with all aval. A-500 additive.

1538hrs- Field Comm report #6 -cutting holes and breeching walls to get to fire. Fire in deep in structure. Fire doubtful. Duration is 1hr 54mins

1600hrs- Field comm report #7- Secondary searches in surrounding are negative. Delayed on fire floor and floor below. Duration is 2hrs 15mins

1616hrs Field Comm report #8- Chief reports 4 lines Streched( 1 to floor above and put through floor, 1 to each adjoining apt. through breeched holees, 1 to fire apt.) fire darkening down. Large amount of debris. Extended overhaul. Duration is 2hrs 32mins

1626hrs- Field Comm reports secondary searches floor above are negative

1638hrs- Field Comm report #9- P/W/H. All visible fire knocked down. Will be a very extended operation due to overhaul. Duration of fire is 2hrs 53mins

1722hrs- Field comm reports FIRE UNDER CONTROL Duration is 3hrs 40mins

Edited by Iceemt21

Share this post


Link to post
Share on other sites



Guest
This topic is now closed to further replies.
Sign in to follow this  
Followers 0

  • Recently Browsing   0 members

    No registered users viewing this page.